Configure Allocation Integrations in Resource Management
Purpose
The Allocation Integrations setup defines how the Resource Management module interacts with the Timesheet Management process.
Through this configuration, administrators specify which allocation status triggers the automatic creation of timesheets.
These statuses are managed globally in the State Machine Contexts section under the Control Center, ensuring workflow consistency across the system.
Access Path
Control Center → Resource Management → Allocations → Integrations
Configuration Overview
This section contains a single parameter with multiple choise in need it:
| Field | Description |
|---|---|
| Status to Create Timesheets | Determines which allocation status will automatically generate corresponding timesheet entries. The list of available statuses (e.g., Worksheet, Submitted, Approved, Rejected) is defined under the State Machine Contexts setup. |
Status Options
The available statuses in this dropdown are configured in:
Access Path:
Main Menu → Control Center → General → State Machine Contexts
Within the Allocations context, administrators can define and customize the workflow of status transitions (e.g., Worksheet → Submitted → Approved → Rejected).
These same statuses appear in the Allocation Integrations parameter, allowing direct linkage between allocation workflows and timesheet creation logic.
Configuration Steps
-
Go to Resource Management → Allocations → Integrations.
-
Under Status to Create Timesheets, select the desired status (e.g., Approved).
-
Click Save to apply the change.
Once set, any allocation reaching the selected status will trigger timesheet generation automatically.
Example
-
Scenario: The organization wants timesheets to be created only after resource allocations are fully approved.
-
Configuration:
-
In the dropdown, select Approved as the trigger status.
-
When an allocation transitions to Approved, the system automatically generates the corresponding timesheet.
-
This ensures timesheets are created only after proper validation and approval, maintaining accuracy in time-tracking and billing.
Best Practices
-
Use Approved as the trigger status for most workflows to ensure validated data consistency.
-
Avoid using early-stage statuses (like Worksheet or Submitted) unless time entry needs to begin before approval.
-
Periodically review the State Machine Contexts setup to align statuses with process changes.
-
Keep the Integration configuration in sync with the organization’s approval policies.
Summary
The Allocation Integrations configuration in Resource Management ensures that timesheet creation is tightly controlled by workflow logic defined in State Machine Contexts.
This setup provides flexibility, process integrity, and alignment between resource planning and time-tracking processes.
Related Articles
System – User Profiles and Access Rules
General Parameters – Global Settings
General Parameters – Types / Global Lists
System Configuration – Companies Setup
Resource Management – Parametrization Overview
Resource Management – Allocation Approvers
Resource Management – Sourcing
Operations Management – Timesheet
Operations Management – Transactions
Help Center